Chief Engineer’s Office
总工程师室
There are 18 existing staff in Chief Engineer Office , including 1 director, 1 deputy director, 5 professional vice presidents, 2 supervisors, and 7 staff.
1. To assist the leaders of the institute to grasp the technical management work of the whole institute, and to assist in the formulation and implementation of technology development planning of the institute.
2. To strengthen the inspection of the operation and implementation of the quality management system; to revise the quality manual and procedure documents of the system documents, to perfect the operation documents; to make and implement the annual quality management system internal audit planning and management review planning; to organize and arrange the regular review and external audit of the institute by the certification authority.
3. To organize the compilation and revision of technical standardization in the institute.